BAT. 3862 CERN / Octavi Mestre Arquitectes
Geneve (Switzerland) / 2013-2015
Structural engineer:BOMAINPASA
Project stages:APS / APD / PRO / ACT / EXE / TRA
Role:Project Leader
Developer:CERN
Sector:Offices
Area:1.350 M2
Budget:5.20M €
Project details:Seismic Analysis, Steel Design, Composite Design, RC Structure, RC Detailing, Ground Works Design